    渣浆泵的后护板安装方法改进

    Improvement of the method for the mounting of the rear guard plate of the slurry pump

    • 摘要: 经过对各类泵的安装方法的研究,改进了泵后护板安装方法。改进后的安装方法,避免了后护板悬空、碰撞、吊钩滑落、丝孔对不正的等诸多问题,减低了安装过程中的安全隐患,可操作性强,减低了劳动强度,加快了检修效率。

       

      Abstract: Through the study of the installation modes of various kinds of pumps, an improved method is used for mounting the rear guard plate of the slurry pump. With the use of the method, a lot of troubles encountered during its mounting process, such as damage of shaft caused by impact of the plate during its lift-up or detachment of lift hook, and the difficulty of getting the sorew-carrying holes well aligned, can all be eliminated, reducing as a result the safety hazard. Besides, the method is highly operable and can help reduce labor intensity and maintenance time.

       

    /