史培宁, 周成龙, 张德林. 锦界电厂煤场改造的可行性分析[J]. 选煤技术, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014
    引用本文: 史培宁, 周成龙, 张德林. 锦界电厂煤场改造的可行性分析[J]. 选煤技术, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014
    SHI Peining, ZHOU Chenglong, ZHANG Delin. Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant[J]. Coal Preparation Technology, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014
    Citation: SHI Peining, ZHOU Chenglong, ZHANG Delin. Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant[J]. Coal Preparation Technology, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014

    锦界电厂煤场改造的可行性分析

    Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant

    • 摘要: 为了合理利用因环保政策要求而关停的锦界电厂煤电一体化项目的露天煤场,通过对煤源市场、铁路外运条件及电厂和化工用户的末煤量缺口、工业场地运输条件等进行分析,确定了该露天煤场的功能和改造建设规模。分析结果表明:对该露天煤场进行封闭,即可满足环保政策要求;煤场建设规模宜确定为3.00 Mt/a,具备煤炭的收购、存储、销售等多种功能,使之既可以存储配套锦界煤矿的自产末煤等产品,也可以收购、销售市场煤。

       

      Abstract: Included in Jinjie Power Plant’s coal-electricity integration project for development is an open-air coal stockyard. The stockyard was later shut down according to the requirement of environmental protection policy. In order to renovate the stockyard for rational use and determine its construction scale, a comprehensive analysis is made of the coal suppliers, railway shipment conditions, the gap of supply of small coal to power stations and chemical sectors, and the existing coal unloading and transportation conditions of the stockyard. Analysis shows that the stockyard needs to have a coal handling capacity of 3.00 Mt/a and operate in an enclosed manner for meeting the environmental protection requirement; the stockyard is required to operate with multiple functions including storage and sales of the small coal coming from Jinjie Coal Mine and external sources.

       

    /

    返回文章
    返回