SHI Peining, ZHOU Chenglong, ZHANG Delin. Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant[J]. Coal Preparation Technology, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014
    Citation: SHI Peining, ZHOU Chenglong, ZHANG Delin. Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant[J]. Coal Preparation Technology, 2021, 49(3): 69-71. DOI: 10.16447/j.cnki.cpt.2021.03.014

    Analysis of the feasibility of technical upgrading of the coal stockyard of Jinjie Power Plant

    • Included in Jinjie Power Plant’s coal-electricity integration project for development is an open-air coal stockyard. The stockyard was later shut down according to the requirement of environmental protection policy. In order to renovate the stockyard for rational use and determine its construction scale, a comprehensive analysis is made of the coal suppliers, railway shipment conditions, the gap of supply of small coal to power stations and chemical sectors, and the existing coal unloading and transportation conditions of the stockyard. Analysis shows that the stockyard needs to have a coal handling capacity of 3.00 Mt/a and operate in an enclosed manner for meeting the environmental protection requirement; the stockyard is required to operate with multiple functions including storage and sales of the small coal coming from Jinjie Coal Mine and external sources.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return